top of page
gray white and black background, sales theme.jpg

SAFE-FIRE NEWS
November 2025

newproject.jpg

November 2025, Indonesia

Safe-Fire TempVision 5000 Delivers Major Efficiency Gains at Pelabuhan Ratu Power Plant, Indonesia

 

We’re excited to share the one-year performance results of the TempVision 5000 Temperature Measurement System at Pelabuhan Ratu Power Plant — and the impact has been exceptional.

After 12 months in operation, TempVision 5000 has helped the plant to achieve:

🔥 5% average improvement in boiler efficiency
💰 USD 2.15 million in annual fuel savings
⏱️ ROI in under 3 months

   

By turning the furnace into a visible combustion environment, TempVision 5000 provides high resolution real-time flame temperature data/images and burner-level insights that empower operators to tune combustion with accuracy and confidence.


Here’s a look at the system installed on-site and the Before/After flame temperature images that illustrate the improvement in burner combustion uniformity.​​

20251211newsa.jpg
20251211newsb.jpg

Before

After

Pelabuhan Ratu Power Plant has been a long-standing partner of Safe-Fire, previously using our TempVision 1000 system — data that contributed to their National Energy-Saving Award in 2021. TempVision 5000 now takes their optimization to the next level with continuous, high-resolution temperature monitoring.


We’re proud to support power plants across Southeast Asia and beyond with advanced, data-driven tools that improve efficiency, reliability, and sustainability.

bottom of page